| 1. Match flow to the hazard | Required discharge in gallons per minute (gpm) or litres per minute (L/min). | Portable units are commonly selected across roughly 250–1,000 gpm (950–3,785 L/min); the appropriate flow depends on the hazard and water supply. | Compare the intended flow with the monitor, nozzle, hose, pump, and water-source limits. Use the applicable fire-protection design or incident plan. | A monitor cannot deliver its rated flow if the supply system cannot provide it. |
| 2. Confirm pressure at the monitor inlet | Operating pressure available at the monitor after hose and fitting losses. | About 100 psi (6.9 bar) is a useful comparison point for some equipment, but actual operating requirements vary by nozzle and flow. | Check the pressure-flow curve and maximum working pressure. Calculate or measure losses through the supply hose, elevation, and fittings. | Pump discharge pressure is not the same as pressure available at the monitor inlet. |
| 3. Verify useful stream reach | The distance at which the stream can reach the target with useful water delivery. | Do not rely on a single generic reach figure. Request tested reach data for the selected flow, inlet pressure, and nozzle pattern. | Ask whether the stated reach is theoretical maximum distance or effective reach, and whether it was measured in still air and at a stated elevation. | Wind, stream breakup, nozzle setting, and target height can substantially change practical reach. |
| 4. Size the hose and water supply | Whether the supply line can deliver the target flow while maintaining required inlet pressure. | Compare candidate hose diameters and lengths using an accepted friction-loss method and the hose manufacturer’s flow data. | Include hose length, bends, adapters, elevation gain, pump capacity, and any other appliances operating on the same supply. | Undersized or overly long supply lines can reduce both flow and reach. |
| 5. Check stability and anchoring | Whether the monitor remains secure at the intended flow and operating angle. | Use only the manufacturer’s stated operating limits and anchoring instructions; there is no single safe flow rating for every ground surface or setup. | Review leg or base design, restraint points, surface requirements, reaction-force guidance, and any required safety devices. | Water reaction force can move or overturn an improperly positioned or unsecured monitor. |
| 6. Match the nozzle and stream pattern | Whether a smooth-bore or adjustable-pattern nozzle best suits the task. | Compare flow and reach at the specific nozzle settings intended for use; performance changes when the flow or pattern changes. | Check nozzle compatibility, operating pressure, selectable flow settings, shutoff method, and suitability for the intended agent. | The nozzle is a key part of the flow-pressure-reach system, not an interchangeable afterthought. |
| 7. Assess portability and operating access | Whether the unit can be transported, deployed, and controlled by the available crew. | Compare actual unit weight and packed dimensions with crew capacity, vehicle storage, access routes, and deployment requirements. | Review carrying handles, setup steps, control reach, elevation and rotation range, drainage, and required maintenance. | A monitor that cannot be safely moved or positioned where needed may not deliver practical coverage. |