| 01 | Match the machine to your product and process | Confirm the case format, materials, dimensions, production rate, changeover needs, and how the machine will fit into the existing line. | Request a written specification, sample-machine trial using your materials, and a clear list of included and optional equipment. | Check that the proposed configuration suits your local power supply, available floor space, production workflow, and intended use. | Ask which setup and process adjustments are included during commissioning and what support is available for later product changes. |
| 02 | Verify supplier capability and manufacturing quality | Assess relevant project experience, production and inspection processes, component sourcing, and the supplier’s ability to meet the agreed specification. | Request a factory audit or live production review, inspection records, a project reference you can verify, and documented quality procedures. | Confirm the contracting entity, manufacturing location, export experience, and who is responsible for installation and technical support. | Identify the service team and escalation contact, rather than relying solely on the sales contact. |
| 03 | Check performance claims under realistic conditions | Distinguish rated speed from sustained output. Review acceptable material tolerances, changeover time, reject handling, and operator requirements. | Ask for a factory acceptance test (FAT) using agreed materials and acceptance criteria, with results recorded in a signed report. | Agree on the test method, measurement units, product samples, and remedies if the equipment does not meet the contract criteria. | Clarify whether remote troubleshooting or an on-site visit is available if actual production results differ from the test. |
| 04 | Review safety and regulatory documentation | Check machine guarding, emergency stops, electrical design, operating instructions, and any conformity requirements that apply in the destination market. | Request the risk assessment, technical documentation, declarations or certificates applicable to the machine, and manuals in the required language. | Confirm requirements with the relevant local authority or a qualified compliance professional. Rules vary by market, machine type, and intended use. | Ask how safety notices, software updates, or replacement parts affecting safe operation will be communicated. |
| 05 | Calculate total landed and operating cost | Consider machine price alongside packaging, freight, insurance, duties, installation, training, utilities, maintenance, and consumables. | Request an itemized quotation, shipping terms, packing details, estimated spare-parts costs, and a list of exclusions. | Check import classification, taxes, customs documentation, and delivery responsibilities with a customs broker or local adviser. | Compare preventive-maintenance costs and the availability and lead time of commonly replaced parts. |
| 06 | Agree on installation, training, and acceptance | Define site preparation, utilities, foundation or floor requirements, installation scope, operator training, and handover responsibilities. | Include an installation plan, training agenda, commissioning checklist, acceptance test procedure, and documentation list in the purchase contract. | Confirm travel, visa, language, local contractor, and site-access arrangements before shipment. | Specify how training records, operating procedures, and troubleshooting materials will be supplied and updated. |
| 07 | Put warranty and service commitments in writing | Review warranty duration and start date, coverage, exclusions, response arrangements, remote-support hours, and repair responsibilities. | Request written warranty terms, service contact details, recommended spare-parts lists, and repair or replacement procedures. | Confirm time-zone coverage, communication channels, language support, and any local service partner arrangements. | Ask how service requests are logged, how urgent cases are escalated, and whether spare parts can be shipped to your market. |