| Magnet grade and performance | State the required NdFeB grade, operating environment, and magnetic circuit requirements. Common grade designations include N35–N52; suffixes such as M, H, SH, UH, or EH indicate higher coercivity categories. | Request a grade-specific datasheet with remanence (Br), intrinsic coercivity (Hcj), maximum energy product (BHmax), and the stated test conditions. Actual performance depends on grade and production specifications. | Can you provide a batch-specific inspection report and identify the applicable material standard? What working temperature and demagnetizing conditions were used to select the grade? |
| Quality assurance | Review the supplier’s documented inspection process, traceability, and controls for incoming material, production, and final inspection. | Request sample inspection records for dimensions, magnetic properties, coating condition, and visual defects. Confirm how lot numbers link finished parts to production records. | Which characteristics are inspected on every lot? Can inspection results be supplied in an agreed format with the shipment? |
| Dimensions and tolerances | Provide a dimensioned drawing that identifies all critical dimensions, datums, edge treatments, and any assembly-related requirements. | Tolerances depend on geometry, size, process, and inspection method. Agree on tolerances for each critical feature rather than relying on a general tolerance statement. | Can you review the drawing for manufacturability and confirm the proposed tolerances before samples are made? |
| Shape and magnetization | Specify the shape (for example, block, disc, ring, or arc), magnetization direction, pole arrangement, and any required polarity marking. | For rings or multi-pole parts, define the pole count and pole locations. Include a drawing or magnetization diagram where orientation affects assembly. | How will magnetization direction and polarity be verified? Can the sample be checked against the assembly drawing? |
| Coating and corrosion protection | Select a coating based on the operating environment, handling, and contact requirements. Common options include nickel-copper-nickel, epoxy, and zinc coatings. | Request the coating type, thickness specification, appearance criteria, and any applicable corrosion-test method and acceptance criteria. Coating suitability depends on exposure conditions. | Is the proposed coating compatible with humidity, chemicals, temperature, and the intended assembly process? |
| Customization and sampling | Agree on drawing revision, material grade, coating, magnetization, packaging, and inspection requirements before sample production. | Use approved samples and a signed specification as the reference for mass production. Record any permitted substitutions or process changes in writing. | What is the sample lead time, and how will changes to the approved drawing or process be communicated? |
| Packaging and handling | Specify separation between magnets, protective packaging, labeling, and measures to prevent chipping, corrosion, or movement in transit. | Neodymium magnets are brittle and can attract one another with significant force. Packaging should protect edges and surfaces and keep parts restrained during handling. | Can you provide packaging details and confirm whether the shipment will be prepared to meet the carrier’s applicable magnetic-shipment requirements? |
| Shipping and export planning | Confirm destination, shipping method, delivery terms, customs documentation, and the required delivery date before placing the order. | Air shipments may require magnetic-field measurement and carrier or aviation compliance checks. Requirements depend on the shipment, route, packaging, and current rules. | Who arranges transport and export documents? Can you confirm the planned carrier, transit estimate, and any shipment-specific compliance checks? |
| Commercial readiness | Compare quotations using the same specification, quantity, inspection level, packaging, and delivery terms. | Request a quotation that separates unit price, tooling or sample charges, packaging, freight, and any stated inspection costs. Confirm quote validity and production lead time. | Are the quoted price and lead time based on the final approved specification and order quantity? |
| Incoming inspection and acceptance | Define acceptance criteria before shipment, including sampling plan, measurement methods, documentation, and nonconformance handling. | For critical applications, consider checking dimensions, coating condition, polarity, and magnetic performance against the approved specification upon receipt. | What is the process for reporting a nonconforming lot, and what supporting evidence is required? |