| 1 | Magnetic performance and test conditions | 15% | Whether the supplier specifies holding or pull force for the proposed assembly, together with the test setup. Measured force depends on factors such as the contacting steel, surface condition, air gap, load direction, and test method. | Request a test report and repeatable test procedure. Compare samples using the same steel plate, contact area, loading direction, and measurement equipment. |
| 2 | Material and grade traceability | 14% | The magnet material used in the assembly, its grade or specification, and the supplier’s ability to link material records to production batches. Ask whether the design uses NdFeB, ferrite, or another material and why it suits the application. | Request material declarations, batch identification, and relevant incoming inspection records. Check that the quoted material matches the drawing and operating requirements. |
| 3 | Dimensional capability and drawing control | 12% | Control of channel dimensions, hole locations, magnet placement, and any specified tolerances. Confirm how drawing revisions are reviewed and approved. | Send a controlled drawing and request a dimensioned sample inspection report. Check critical dimensions on samples before approving production. |
| 4 | Operating environment and temperature suitability | 11% | Compatibility with the expected temperature, humidity, vibration, and exposure conditions. Maximum service temperature depends on the magnet grade and assembly design; it should not be inferred from material family alone. | Provide the actual operating conditions and ask for the proposed grade, design limits, and supporting technical documentation. Validate performance under relevant application conditions. |
| 5 | Corrosion protection and finish | 10% | Protection for both the magnet and the steel channel, including coating or plating type, coverage, and suitability for the intended environment. A coating on one component does not necessarily protect the complete assembly. | Request coating specifications and inspection criteria. For demanding environments, define exposure conditions and agree on an appropriate verification test before ordering. |
| 6 | Quality management and inspection records | 10% | Documented production controls, nonconformance handling, calibration practices, and final inspection. If a supplier claims certification, confirm its validity, scope, and issuing body. | Review relevant quality documents and a sample inspection record. Ask how defects are contained, investigated, and prevented from recurring. |
| 7 | Manufacturing process and assembly consistency | 8% | How the channel, magnet components, bonding or fixing method, and assembly orientation are controlled. Confirm that changes to materials or processes require approval. | Request a process overview and sample approval plan. Check assembly orientation and construction against the approved drawing or specification. |
| 8 | Sampling, customization, and production readiness | 8% | Ability to produce the required shape, mounting features, and magnetic configuration, as well as clarity on sample and production lead times. | Start with a defined prototype or pre-production sample. Approve documented acceptance criteria before placing a repeat or volume order. |
| 9 | Compliance and material documentation | 7% | Availability of documents required for the destination market and application, such as material declarations or applicable restricted-substance documentation. Requirements depend on the product and market. | State the destination market and required documents in the request for quotation. Verify documents against the exact material and product being supplied. |
| 10 | Commercial clarity and export packing | 5% | Clear quotation scope, minimum order quantity, payment terms, delivery basis, packaging, and responsibility for freight or duties. Confirm packaging protects the parts and accounts for magnet handling requirements. | Compare quotations on the same specification and delivery basis. Request a packing description and confirm shipping documents and delivery responsibilities in writing. |