| Product sample | Inspect the sample in operation and confirm that it represents the proposed model, pixel pitch, cabinet, and LED configuration. | Sample specification sheet, operating video, and written confirmation that the production model will match the approved sample. | Compare the sample with the project requirements under the intended viewing conditions, not only in close-up photographs. | The sample specification is incomplete, or the supplier cannot explain differences between the sample and the quoted product. |
| Transparency and visibility | Check visibility through the display, image brightness, contrast, and appearance from the intended viewing distances. | Clear photographs or video showing both the screen image and the background through the display, with viewing conditions stated. | Assess the balance between image visibility and the required level of transparency for the site. | Transparency is described with a single figure but without explaining the measurement method or display configuration. |
| Technical specifications | Review pixel pitch, module and cabinet dimensions, brightness, refresh rate, power requirements, weight, and operating environment. | Current datasheet, cabinet drawings, electrical details, and a written response to project-specific requirements. | Specifications are consistent across the datasheet, quotation, drawings, and sample documentation. | Key specifications are missing, inconsistent, or stated without a defined model or configuration. |
| Sample testing | Test uniformity, dead or stuck pixels, color consistency, flicker, signal stability, and normal startup and shutdown. | Sample test checklist and agreed inspection criteria, including any pixel-defect acceptance limits. | Acceptance criteria are agreed in writing before order confirmation and applied to the delivered product. | Quality claims rely only on visual inspection by the supplier, with no agreed acceptance process. |
| Installation planning | Confirm mounting method, structural load information, ventilation, cable routing, access for maintenance, and site responsibilities. | Installation drawings, interface details, project checklist, and a clear list of work provided by each party. | The proposed design is reviewed against the actual site conditions and coordinated with the local installation team. | Installation is described as “easy” without drawings, site requirements, or allocation of responsibilities. |
| Installation support | Clarify whether support is remote, on-site, or provided through training, and confirm availability and any additional costs. | Written support scope, communication channels, working-hour coverage, and any travel or service charges. | Support arrangements and escalation contacts are confirmed before shipment and aligned with the installation schedule. | On-site assistance or response times are discussed verbally but excluded from the written agreement. |
| Control system and commissioning | Verify compatibility with the planned control method, input sources, content workflow, and network or electrical setup. | System diagram, controller and software details, configuration requirements, and commissioning procedure. | The supplier explains the required hardware, configuration steps, and handover information for the operating team. | Compatibility is assumed without checking the project’s signal sources or control requirements. |
| Warranty and after-sales service | Review warranty duration, coverage, exclusions, replacement-part process, troubleshooting, and service response arrangements. | Written warranty terms, service procedure, parts availability information, and contact or escalation process. | Coverage, claim requirements, shipping responsibilities, and service channels are stated clearly in the contract documents. | Warranty terms are vague, or the supplier gives no defined process for diagnosing and resolving faults. |
| Spare parts and maintenance | Ask which modules and components are replaceable, what tools are needed, and how replacement parts are identified. | Recommended spare-parts list, maintenance instructions, component labels, and replacement guidance. | Spare parts are specified for the exact configuration, with a practical method for identifying and replacing faulty components. | Parts are not clearly identified, or replacement depends on returning the full display without a stated process. |
| Project documentation | Confirm delivery of final drawings, configuration files, operating instructions, maintenance guidance, and test records. | Document list and handover requirements included in the purchase or project agreement. | Documentation is scheduled as part of delivery and commissioning rather than treated as an informal extra. | There is no agreed handover package or ownership of configuration files and operating records. |