| Household needs | How many people will live in the home now, and how might that change? | Bedroom and bathroom needs depend on household size, privacy preferences, and future plans. A flexible room can serve as an office, guest room, or playroom. | List essential rooms separately from optional features. Plan for likely changes, such as working from home or needing a ground-floor bedroom. |
| Floor plan and size | How much living space do you need, and how will each room be used? | More floor area generally increases material, foundation, transport, and finishing requirements. A compact, efficient layout may reduce both construction costs and ongoing energy use. | Prioritize usable space and room layout over a target square footage. Check that the proposed design fits the site and local requirements. |
| Accessibility and comfort | Do you need step-free access, wider circulation, or an adaptable bathroom? | Features such as a level entry, wider doorways, and an accessible bathroom are easier to include during design than to retrofit later. | Identify mobility and comfort requirements early, including accessibility needs that may arise in the future. |
| Land and site conditions | Do you own a suitable lot, and is it ready for construction? | Zoning, setbacks, soil conditions, slope, drainage, utility access, and road access can affect feasibility and cost. Site preparation and utility connections may be separate from the home package. | Confirm local zoning and building requirements, and arrange appropriate site assessments before finalizing a design or budget. |
| Total project budget | What is your maximum budget for the complete, move-in-ready project? | A quoted home price may not include land, foundation, site work, utility connections, transport, crane setting, permits, taxes, or landscaping. Inclusions differ by contract. | Request an itemized scope and compare the same inclusions across proposals. Keep a contingency allowance—often around 10–15% as a planning guideline, adjusted for site and project uncertainty. |
| Financing and payment schedule | How will you fund the home, land, and construction stages? | Construction financing may use staged payments and can have different requirements from a standard mortgage. Lender rules, appraisal timing, and local practices vary. | Speak with lenders early. Confirm when funds are needed, what inspections or documents are required, and whether the financing covers site work and installation. |
| Permits and approvals | Which approvals are required before work can begin? | Local authorities determine zoning, building permits, inspections, and applicable code requirements. Approval timelines depend on jurisdiction, application completeness, and project complexity. | Contact the relevant local planning and building departments early, and include permit review time in the schedule. |
| Overall timeline | When do you need the home to be ready for occupancy? | Factory production may take several weeks; site preparation, approvals, transport, installation, and finishing add time. These stages can sometimes overlap, but weather, access, and approvals can cause delays. | Ask for a written schedule with milestones and dependencies. Build in a buffer rather than relying on a single estimated completion date. |
| Transport and installation | Can the modules reach the site and be set in place safely? | Delivery may require suitable road access, turning space, overhead clearance, and crane access. Restrictions and costs depend on module dimensions and the route. | Arrange an access review before committing to a layout. Confirm who is responsible for delivery, permits for transport, crane work, and setting the modules. |
| Energy performance and finishes | Which efficiency features and finishes matter most? | Insulation, windows, heating and cooling systems, ventilation, and air sealing affect comfort and energy use. Available specifications and code requirements vary by location. | Compare written specifications, not just appearance. Prioritize the features that suit your climate and long-term operating-cost goals. |
| Contract and warranty | What is included, who coordinates the work, and how are issues handled? | Responsibilities for design, permits, site work, delivery, installation, and finishing can differ. Warranty coverage and claim procedures are contract-specific. | Review the scope, exclusions, payment milestones, change-order process, completion criteria, and warranty terms before signing. |