| Glass Type | Clear annealed glass | Confirm that the film is approved for the glass thickness and installation surface. Check whether the film is intended for interior or exterior application. | Written compatibility statement and installation instructions identifying approved glass types and thicknesses. | Before purchase | Required |
| Glass Type | Heat-strengthened or fully tempered glass | Verify the film’s solar-heat and thermal-stress limitations. Tempered glass is stronger than annealed glass, but film application can still affect heat absorption and temperature differences. | Glass-specific compatibility table, maximum recommended solar absorption, and thermal-stress guidance. | Before installation | Required |
| Glass Type | Laminated glass | Confirm that the film adhesive and installation method are approved for laminated construction. Check edge-seal, interlayer, and moisture-exposure requirements. | Specific approval for laminated glass and any required edge-clearance or sealing procedure. | Before installation | Required |
| Glass Type | Insulating glass unit, including double or triple glazing | Determine whether the film may be installed on the room-side surface, outdoor surface, or not at all. Confirm that the film will not invalidate the insulating-glass warranty or increase thermal stress beyond the permitted limit. | Compatibility statement for insulating glass units, including surface number and allowable installation location. | High importance | Required |
| Glass Coating | Low-emissivity, solar-control, reflective, tinted, or coated glass | Identify the coating location and glass surface. Additional solar absorption from the film can change glass temperature and may affect thermal-stress performance. | Glazing make-up, coating location, film compatibility confirmation, and heat-stress assessment where applicable. | High importance | Required |
| Glass Condition | Existing cracks, chips, deep scratches, failed seals, or damaged edges | Do not use the film to conceal or stabilize damaged glazing. Repair or replace defective glass before installation. | Pre-installation inspection record with photographs and glass-condition notes. | Safety check | Reject Until Corrected |
| Film Operation | Electrically controlled or automatically darkening film | Confirm operating voltage, current demand, control method, switching cycle, response time, operating temperature, and fail-safe state. | Technical data sheet, wiring diagram, control instructions, and electrical safety information. | Before purchase | Required |
| Optical Performance | Visible transmittance in the clear and dark states | Compare the daylight level required by the room with the film’s actual clear-state and dark-state visible transmittance. Do not rely only on marketing descriptions such as “light” or “dark.” | Measured visible-transmittance values for each operating state, with test conditions and sample construction. | Performance check | Recommended |
| Solar Performance | Solar transmittance, reflectance, and absorptance | Review how much solar radiation is transmitted, reflected, and absorbed in each operating state. High absorption may increase the glass temperature and thermal-stress risk. | Test report using ASTM E903 or another clearly identified, technically appropriate method. | Performance check | Required |
| ASTM E903 Evidence | Solar-optical test documentation | Confirm that the report identifies the specimen construction, measurement geometry, operating state, test date, measured wavelength data or calculated solar properties, and laboratory information. | Complete ASTM E903 test report. ASTM E903 is a test method for measuring solar absorptance, reflectance, and transmittance; it is not, by itself, a product certification. | Documentation check | Required |
| NFRC 200 Evidence | Fenestration solar-heat-gain and visible-transmittance data | Check whether the document reports the complete glazing system rather than the film alone. Review the stated glass, gap, coating, frame, and film configuration. | NFRC 200 calculation or test documentation, with the exact product assembly and reported solar heat gain coefficient and visible transmittance where applicable. | Documentation check | Required |
| Test Scope | Film-only data versus complete window data | Do not treat film-only optical data as equivalent to performance data for a complete window. Glass type, coatings, air spaces, frames, and film state can change the final result. | Test specimen description showing whether results apply to the film, glass-film combination, or complete fenestration product. | Critical review | Verify Scope |
| Thermal Stress | High solar exposure, dark frames, partial shading, or uneven shading | Assess conditions such as exterior overhangs, blinds, adjacent buildings, mullions, stickers, and furniture that can create uneven glass temperatures. | Site exposure review and manufacturer’s thermal-stress limitations or calculation procedure. | Site-specific | Conditional |
| Weather Exposure | Exterior installation | Confirm resistance to ultraviolet exposure, moisture, wind, temperature cycling, and perimeter-seal requirements. Interior-rated film should not be assumed suitable for exterior use. | Exterior-use rating, weathering data, installation details, and expected service conditions. | Before installation | Conditional |
| Safety Glazing | Doors, sidelites, low windows, and other impact-prone locations | Determine whether the existing glass must meet a safety-glazing requirement. Film application does not automatically make non-safety glass compliant. | Applicable building-code review and safety-glazing documentation for the complete assembly. | Code check | Required |
| Installation Surface | Interior surface, exterior surface, or special coated surface | Confirm surface preparation, adhesive compatibility, edge clearance, curing time, cleaning restrictions, and whether the film can be removed without damaging the coating. | Installation manual and surface-specific application procedure. | Installation check | Required |
| Documentation Quality | Unverified brochure, incomplete chart, or generic test claim | Reject documents that omit the test method, specimen construction, operating state, measurement conditions, or report identification. | Traceable report with document number, revision, specimen description, measured results, and laboratory details. | Document review | Insufficient |
| Final Selection | All compatibility and performance checks completed | Select the film only when the actual glass assembly, installation location, operating conditions, and documented optical or solar data match the project requirements. | Signed compatibility review, final glazing schedule, test documentation, and installation approval. | Final approval | Proceed |