| Pallet and load profile | Pallet dimensions, loaded weight, load height, overhang, and load stability | Use actual maximum loaded weights and pallet dimensions when specifying beam lengths and clearances. Include unusual or non-uniform loads in the design review. |
| Required rack capacity | Load per pallet, pallets per beam level, number of levels, and total bay configuration | Have a qualified rack designer verify beam, upright-frame, connection, and overall system capacities for the proposed configuration. Do not infer capacity from appearance or component size. |
| Future expansion | Expected inventory growth, additional pallet positions, and possible changes in load weight or dimensions | Forecast growth over the planning period and identify space for future rows or bays. Treat any capacity reserve as a planning allowance—not permission to exceed posted rack limits. |
| Warehouse layout and clearances | Aisle widths, lift-truck turning needs, sprinkler coverage, exits, columns, doors, and building services | Lay out the system around the equipment and building constraints. Keep required exits, fire-protection equipment, and access routes unobstructed; confirm applicable local requirements before installation. |
| Floor and anchorage | Slab condition, floor levelness, concrete properties, anchor locations, and site-specific seismic conditions | Confirm that the floor and anchorage suit the rack design and site conditions. Resolve cracks, unevenness, or other concerns with appropriate building or engineering professionals before installation. |
| Inspection plan | Assigned inspectors, inspection frequency, reporting method, and escalation process | Set a documented inspection schedule based on operating conditions and applicable requirements. Train staff to report visible damage promptly, and arrange a competent assessment when damage or a safety concern is found. |
| Damage response | Criteria for isolating affected areas, unloading bays, repair approval, and return to service | Create a clear process for restricting access to potentially unsafe areas and obtaining qualified evaluation. Replace or repair components only using an approved method; do not straighten or modify damaged members without authorization. |
| Routine maintenance | Upright protection, anchors, beam connectors and locks, floor condition, and housekeeping | Include these items in routine checks and keep aisles clear. Maintain installed safety devices and address loose, missing, or damaged parts through an approved maintenance procedure. |
| Load information and staff training | Approved rack configuration, maximum permitted loads, safe loading practices, and change-control process | Keep capacity information visible and consistent with the approved design. Train operators not to exceed posted limits, and obtain a design review before changing beam levels, components, or the rack layout. |
| Expansion compatibility | Future bay additions, replacement components, connection compatibility, and revised layout drawings | Keep approved drawings and component details on file. Before adding bays or mixing components, verify compatibility and have the revised configuration checked for capacity and stability. |