| Applicable LPG and route | Confirm the cargo composition, correct shipping description and UN number, intended transport modes, and every country on the route. | Applicable dangerous-goods rules may include the IMDG Code for sea, ADR for road in participating countries, RID for rail, and national regulations. | Product safety data sheet, cargo specification, route plan, and a written classification review by a qualified dangerous-goods professional. | Requirements depend on the substance, transport mode, jurisdiction, and route. LPG mixtures and individual gases can have different classifications. |
| Tank approval and design | Check that the tank’s approval covers the intended gas, design pressure, service conditions, and transport jurisdictions. | For an applicable UN portable tank, verify the design and operating conditions against the relevant IMDG Code requirements and portable-tank instruction, such as T50 where applicable. | Type-approval certificate, tank data plate, design documentation, and confirmation that the approval remains valid for the proposed service. | A general certificate or a tank described simply as “LPG-ready” does not establish approval for every gas, pressure, or route. |
| Pressure-vessel construction | Verify the vessel’s design pressure, design temperature, materials, weld records, and construction code against the cargo and operating conditions. | Applicable construction rules vary by tank design and jurisdiction. ASME Boiler and Pressure Vessel Code requirements may apply to certain vessels, but are not a substitute for transport approvals. | Manufacturer’s data report where applicable, material certificates, welding and inspection records, and code or conformity documentation. | Pressure-vessel construction and dangerous-goods transport approval address related but distinct requirements. |
| Periodic inspection and testing | Check inspection dates, test status, defects, repair history, and whether the tank will remain within its inspection period throughout the planned operation. | Inspection and test intervals and procedures depend on the governing transport rules, approval, and tank type. | Current inspection and test certificates, permanent tank markings, maintenance records, and records of any repairs or alterations. | An expired test, undocumented repair, or damaged pressure-retaining part can make a tank unsuitable or non-compliant. |
| Pressure-relief devices | Verify that relief devices are approved for the service, correctly set, in good condition, and protected from damage or obstruction. | Use the requirements applicable to the approved tank design and the governing dangerous-goods rules; do not infer the correct setting from a generic LPG value. | Device identification and certification, inspection records, set-pressure documentation, and checks of protective covers and discharge arrangements. | Relief devices are critical safeguards. Their selection and settings must match the approved tank design and service. |
| Valves, fittings, and connections | Confirm that liquid and vapour connections, shut-off valves, seals, and fittings are compatible with the cargo and designed for the tank’s pressure and temperature range. | Follow the tank approval, applicable transport rules, and the equipment manufacturer’s specifications. | Valve and fitting specifications, inspection records, leak-test results where required, and a pre-loading checklist. | Damaged, incompatible, or incorrectly connected equipment can cause leaks or prevent safe isolation. |
| Filling limits and loading controls | Determine the permitted filling limit for the actual gas, filling temperature, tank capacity, and applicable rules. Use an approved loading procedure. | Apply the governing dangerous-goods code and tank approval; do not use a single assumed percentage for every LPG cargo or operating condition. | Documented loading calculation or approved loading instructions, calibrated measurement equipment, and loading and unloading procedures. | Liquefied gas expands as temperature rises. Correct filling controls help preserve required vapour space and prevent overfilling. |
| Intermodal container approval | Check the container’s structural condition and approval for the intended modes of transport, lifting, stacking, and handling. | The CSC Safety Approval Plate relates to container safety for international transport. ISO 1496-3 addresses specifications and testing for Series 1 tank containers. | Legible CSC plate where required, structural inspection records, container identification, and evidence of applicable design and testing approvals. | Structural container approval does not, by itself, demonstrate pressure-vessel or dangerous-goods compliance. |
| Regional conformity requirements | Confirm whether additional regional rules apply to the tank, its operation, or its use as transportable pressure equipment. | For relevant European operations, ADR and the Transportable Pressure Equipment Directive (2010/35/EU) may apply, depending on the equipment and activity. | Applicable conformity assessment and inspection documents, identification markings, and confirmation from the competent authority or qualified compliance adviser. | Regional requirements may add obligations beyond the tank’s original design approval or another jurisdiction’s certification. |
| Emergency readiness and operating controls | Ensure staff understand the cargo hazards, isolation procedures, emergency response arrangements, and applicable dangerous-goods documentation duties. | Follow applicable transport rules, site procedures, and local emergency-planning requirements. | Written operating and emergency procedures, staff training records, required transport documents, and inspection checklists. | Safe equipment needs trained operators and practical procedures for loading, transport, unloading, and incident response. |