| Typical conveying velocity | Relatively high; often approximately 15–30 m/s, depending on the material and system design. | Relatively low; often approximately 2–10 m/s, depending on the material and conveying method. | These are indicative ranges, not design limits. The required velocity depends on particle size, density, pipe layout, and the risk of settling or degradation. |
| Typical solids loading | Lower solids-to-air loading; commonly used when substantial airflow is acceptable. | Higher solids-to-air loading; more material is conveyed relative to the air used. | Loading ratios and phase definitions vary between applications and suppliers. Confirm them through material testing and system design. |
| Material characteristics | Often suitable for free-flowing, robust powders and granules that tolerate higher conveying velocities. | Often considered for fragile, abrasive, or dust-sensitive materials that benefit from gentler handling. | Assess particle size distribution, bulk density, moisture, cohesiveness, abrasiveness, and friability before selecting a conveying mode. |
| Product handling | Higher particle velocity can increase attrition, breakage, and wear, particularly at bends. | Lower velocities can reduce impact and erosion, although plugs or poor operating conditions can still damage product or equipment. | For fragile products or strict particle-size requirements, request conveying trials using representative material. |
| Air and energy considerations | Typically requires higher airflow and can involve higher air velocity through the conveying line. | Typically uses lower conveying air velocity and higher solids loading; pressure requirements depend on the system configuration. | Compare total system energy, including the air mover, feeder, filtration, and controls—not airflow or pressure alone. |
| Equipment and operation | Often has a comparatively straightforward layout, but needs reliable feeding and dust collection. | May require specialized feeding, pressure control, and conveying-cycle controls, especially for batch operation. | Consider operator experience, maintenance access, process continuity, and the complexity of the feeding arrangement. |
| Common application priorities | Good fit when flexible routing, simpler operation, and robust product handling are key priorities. | Good fit when limiting product damage, reducing line wear, or handling material at a higher solids loading is important. | Neither phase is universally better. The right choice depends on the material, throughput, route, and operating constraints. |
| Information needed for final design | Required throughput; conveying distance and elevation; pipe bends and diameter; material properties; operating schedule; allowable degradation; and available air, power, and space. | Use these inputs for a system assessment and, where appropriate, material testing or a pilot trial. |