| 1 | Airflow Capacity | Match the supply and extract airflow to the building size, occupancy, room use, duct resistance, and local ventilation rules. Check both nominal and external-static-pressure airflow. | Common residential units are often specified from approximately 100 to 500 m³/h. Actual airflow may be substantially lower at higher external static pressure. | Fan curve, airflow table at stated pressure points, operating range, commissioning procedure, and recommended duct size. | Select a unit using the design airflow at the project’s calculated pressure, not the free-air maximum. |
| 2 | Heat-Recovery Performance | Compare sensible temperature efficiency, latent recovery where applicable, airflow balance, test conditions, and frost-control impact. | Residential HRVs commonly report sensible recovery efficiencies around 60%–90%, but results vary with airflow, temperature difference, humidity, and test method. | Independent performance report, test standard, test airflow, indoor/outdoor temperatures, humidity conditions, and defrost assumptions. | Compare products only when the test conditions and definitions are equivalent. |
| 3 | Climate and Frost Protection | Assess operation in cold, hot, humid, coastal, dusty, or high-altitude environments. Review preheating, bypass, condensate drainage, and automatic defrost logic. | Cold-climate units may require frost protection below approximately 0°C, depending on indoor humidity, airflow, and exchanger design. | Minimum operating temperature, defrost sequence, heater power, condensate requirements, insulation details, and climate test data. | Choose controls that prevent frost without unnecessarily stopping balanced ventilation. |
| 4 | Noise and Vibration | Review sound power or sound pressure data, fan speed, casing insulation, vibration isolation, and noise transmitted through ducts. | Noise performance is highly installation-dependent. A low published dB(A) value is meaningful only when the distance, room absorption, airflow, and test method are stated. | Acoustic test report, sound-power data by octave band where available, mounting instructions, and recommended flexible connectors. | Specify a maximum noise level for bedrooms and occupied zones, then verify it during commissioning. |
| 5 | Energy Consumption | Check fan input power, specific fan power, standby consumption, heater energy for frost control, and control efficiency. | Annual energy use depends on airflow schedule, pressure, climate, fan efficiency, and defrost operation; it cannot be estimated reliably from recovery efficiency alone. | Power draw at several airflow points, specific fan power or comparable metric, standby watts, and annual energy assumptions. | Calculate life-cycle energy cost using the destination country’s electricity and heating prices. |
| 6 | Filters and Indoor-Air Quality | Confirm filter dimensions, filtration class, pressure drop, replacement interval, outdoor-air protection, and accessibility for maintenance. | Filter classifications differ by region. ISO 16890 uses ePM categories, while other markets may use different rating systems; ratings should not be compared without checking the test method. | Filter test classification, initial and final pressure-drop data, filter availability, part numbers, prices, and replacement instructions. | Prefer standard-size, locally obtainable filters and include filter replacement in the operating budget. |
| 7 | Certifications and Compliance | Verify electrical safety, electromagnetic compatibility, energy-performance testing, material requirements, and destination-market regulatory obligations. | Depending on the market, relevant references may include CE or UKCA requirements, applicable electrical safety standards, AHRI or CSA performance programs, EN 13141-7, and ISO 16890 for filters. | Current certificates, declarations of conformity, complete model numbers, test reports, validity dates, certification scope, and authorized laboratory details. | Confirm that the certificate covers the exact model and voltage configuration being purchased. |
| 8 | Supplier Capability and Quality | Evaluate production capacity, quality-control procedures, component traceability, export experience, engineering support, and ability to maintain product consistency. | Useful checks include documented incoming inspection, end-of-line electrical testing, airflow or leakage testing, serial-number traceability, and corrective-action records. | Factory audit responses, quality certificates, inspection plan, sample test records, production lead time, and reference project evidence without undisclosed substitutions. | Use a pre-shipment inspection and define acceptance criteria before issuing the purchase order. |
| 9 | Total Cost of Ownership | Include equipment, controls, freight, duties, installation, ductwork, commissioning, filters, spare parts, electricity, defrost heating, and disposal costs. | A useful comparison period is commonly 5–10 years. The lowest purchase price may have a higher total cost if filters, controls, fans, or service are expensive. | Itemized quotation, Incoterms, packaging dimensions, tariff classification, spare-parts price list, filter cost, warranty exclusions, and estimated maintenance schedule. | Compare suppliers using the same duty-paid or landed-cost basis and the same performance target. |
| 10 | After-Sales Support and Warranty | Review warranty duration, response time, spare-parts availability, remote diagnostics, installer training, software support, and procedures for warranty claims. | A practical support review should cover at least the expected service life, routine filter replacement, fan and sensor replacement, and availability of technical documentation. | Written warranty terms, service-level agreement, escalation contacts, troubleshooting guide, parts lead times, training materials, and return or repair process. | Make after-sales obligations contractual, including response times and spare-parts support for the target market. |