| Project Experience | Relevant experience with indoor, outdoor, commercial, residential, or municipal fountain projects. | Project portfolio, technical case studies, installation photos, and client references with permission. | 15% | To Verify |
| Design Capability | Ability to provide drawings, hydraulic calculations, equipment layouts, and coordinated electrical plans. | Sample 2D drawings, 3D renderings, nozzle layout, pump selection data, and design revision procedure. | 15% | To Verify |
| Material Specification | Materials must match water quality, weather exposure, structural loads, and the required service life. | Material grades, thicknesses, welding method, surface treatment, and material certificates where applicable. | 12% | To Verify |
| Pump and Electrical Safety | Pump capacity, electrical ratings, grounding, protection, and control components must suit the project location and local requirements. | Pump curves, motor data sheets, wiring diagrams, protection details, and applicable conformity documentation. | 12% | To Verify |
| Water and Weather Conditions | The design should account for evaporation, splash, drainage, wind, freezing conditions, water treatment, and maintenance access. | Site-condition checklist, drainage plan, water-treatment recommendations, winterization method, and maintenance schedule. | 10% | To Verify |
| Sample and Prototype Testing | Critical nozzles, lighting, control functions, water effects, and finish quality should be checked before mass production. | Sample approval record, factory test video, inspection checklist, and agreed acceptance criteria. | 10% | To Verify |
| Quality Control | Documented incoming-material, in-process, assembly, pressure, electrical, and final inspection procedures. | Quality manual, inspection forms, nonconformity process, calibration records, and third-party inspection option. | 10% | To Verify |
| Production Capacity | Capacity must match the required quantity, delivery schedule, fabrication complexity, and installation sequence. | Production schedule, capacity confirmation, critical-path plan, subcontracting disclosure, and progress-report format. | 8% | To Verify |
| Documentation and Compliance | All drawings, manuals, certificates, labels, and test records must meet the destination market and project specifications. | Document list, applicable local codes, declaration documents where required, operation manual, and spare-parts list. | 8% | To Verify |
| Warranty and After-Sales Service | Warranty scope, response time, spare-parts availability, remote support, and site-service responsibilities must be written clearly. | Warranty terms, service workflow, spare-parts pricing, troubleshooting guide, and escalation contacts. | 6% | To Verify |
| Total Evaluation Weight | 100% | Pending Review |