| 1. Prepare the roof | Review the approved roof layout, structural supports, panel direction, and project-specific installation instructions. | Confirm that the supporting structure is sound, aligned, and suitable for the panel system. Use fall protection and follow site safety requirements. | Support locations, roof dimensions, slope, openings, and required safety measures are verified before work begins. |
| 2. Position the eave flashing | Install the eave trim at the lower roof edge before placing the panels, where the roof detail calls for it. | Align the flashing to the roof edge and provide the specified overlap and water-shedding direction. Use compatible fasteners and sealant where required by the detail. | The trim is straight, securely attached, and arranged so water drains outward rather than behind the flashing. |
| 3. Set the first panel | Place the first panel square to the eave and align it with the roof layout. | Check the panel orientation and bearing before fastening. Install fasteners at the locations and spacing specified for the panel system and supporting structure. | The panel is square, fully supported, and fastened without overdriving or distorting the facing sheets. |
| 4. Install adjoining panels | Place each panel alongside the previous one and engage the side joint according to the system design. | Keep the joint fully engaged and panels aligned. Apply joint sealant or install a sealing strip only where specified; do not block drainage paths or leave gaps in the joint. | Side joints are continuous and closed, panel edges are aligned, and no core material is exposed. |
| 5. Fasten and seal panel joints | Complete the specified fastening pattern and seal joint locations that are identified in the approved details. | Use compatible fasteners, washers, and sealants. Follow the required fastener type, placement, and spacing; sealant requirements vary by panel design and exposure. | Fasteners are secure and correctly seated. Sealant is continuous where required, with no missed gaps or obstructed drainage channels. |
| 6. Fit ridge closure and flashing | Install the specified ridge closures, ventilation components, and ridge flashing at the roof peak. | Use the correct closure profile for the panel ribs. Position closures and sealant as detailed, then overlap and fasten ridge flashing to shed water away from the ridge joint. | Closures match the panel profile, the ridge is weather-protected, and any designed ventilation route remains open. |
| 7. Install rake and edge flashing | Fit rake or verge flashing along sloping roof edges and complete other perimeter trims shown in the project details. | Lap adjoining pieces in the direction of water flow and use the specified closures, fasteners, and sealant. Detail corners and transitions to prevent water entry. | Edges are covered, overlaps are secure, and flashing does not interfere with panel movement or drainage. |
| 8. Inspect and clean the roof | Inspect completed joints, flashings, fasteners, and roof penetrations; remove metal swarf and installation debris. | Repair damaged coatings using an approved method. Avoid abrasive cleaning or incompatible chemicals, and do not leave metal cuttings on the roof surface. | No loose fasteners, open joints, exposed cores, debris, or visible gaps remain; all details match the approved project documentation. |