| 1 | Droplet-Formation Precision | 18% | Uniformity of droplet size, repeatability between batches, and stability during continuous operation. | Independent test records, particle-size distribution data, repeatability studies, and customer acceptance reports. | 0–10 points |
| 2 | Process-Control Capability | 14% | Accuracy of control over flow rate, pressure, temperature, timing, nozzle position, and molding conditions. | Control-system specifications, calibration certificates, software screenshots, and documented operating ranges. | 0–10 points |
| 3 | Application Compatibility | 12% | Suitability for the buyer’s materials, viscosity range, droplet size range, substrate, and production method. | Material compatibility charts, application test results, sample runs, and engineering review records. | 0–10 points |
| 4 | Equipment Reliability | 12% | Operational uptime, component durability, fault frequency, maintenance intervals, and recovery after stoppage. | Factory acceptance tests, service records, preventive-maintenance schedules, and reference-site feedback. | 0–10 points |
| 5 | Manufacturing and Quality Systems | 10% | Maturity of incoming inspection, process control, final inspection, traceability, and corrective-action procedures. | Quality manuals, inspection plans, batch records, audit results, and applicable management-system certificates. | 0–10 points |
| 6 | Customization and Integration | 9% | Ability to modify fixtures, tooling, interfaces, automation, sensors, recipes, and data connectivity. | Engineering change examples, interface documentation, customization lead times, and integration test reports. | 0–10 points |
| 7 | Safety and Regulatory Readiness | 8% | Electrical safety, guarding, emergency controls, risk assessment, user documentation, and market-specific conformity support. | Risk assessments, electrical test reports, conformity documentation, manuals, and safety inspection records. | 0–10 points |
| 8 | After-Sales Service | 7% | Installation support, operator training, response time, spare-parts availability, remote diagnostics, and warranty coverage. | Service-level agreements, support organization details, spare-parts lists, training plans, and warranty terms. | 0–10 points |
| 9 | Delivery and Project Execution | 5% | Quotation accuracy, design-review discipline, production scheduling, commissioning, and on-time delivery performance. | Project schedules, acceptance milestones, delivery records, installation protocols, and documented change control. | 0–10 points |
| 10 | Total Cost of Ownership | 5% | Purchase price, tooling, installation, energy use, consumables, maintenance, spare parts, and expected service life. | Itemized quotations, operating-cost estimates, maintenance budgets, consumables data, and lifecycle-cost calculations. | 0–10 points |