| 1 | Product definition and intended use | A drawing and written description identifying the wire rope, end termination, threaded component, dimensions, materials, and intended lifting application. | Check that the proposed assembly matches the actual attachment point and load direction. Do not treat a generic threaded lifting eye as interchangeable with a wire-rope lifting assembly. |
| 2 | Rated capacity and loading conditions | The working load limit (WLL), applicable load configuration, and any restrictions for angle, side loading, temperature, or dynamic use. | Ensure the rating is stated for the complete assembly and the intended configuration. Ask for engineering clarification where load angles or off-axis forces are involved. |
| 3 | Applicable standards | The standards and regulations the supplier claims are applicable to the product and market, with supporting documentation. | Check the current scope and edition of each cited standard. EN 13414-1 addresses steel wire rope slings; ASME B30.9 covers slings. Applicability depends on product design and jurisdiction. |
| 4 | Traceability and identification | A sample product marking and a sample certificate or inspection record showing how each assembly or production batch is identified. | Confirm that markings and records can link the product to its rated capacity, manufacturer or supplier records, and relevant production or inspection information. |
| 5 | Materials and component records | Material specifications and, where required by the purchase specification, material test certificates for wire rope, threaded parts, and other load-bearing components. | Check that documents correspond to the supplied components and specified grades. A material certificate alone does not prove that the finished assembly is suitable for lifting. |
| 6 | Termination and assembly quality | Details of the rope termination method, assembly controls, inspection points, and acceptance criteria. | Ask how the supplier controls termination quality and verifies completed assemblies. Review product samples or inspection records where practical; do not rely solely on appearance. |
| 7 | Testing and inspection | The inspection and testing plan, test method, acceptance criteria, and product- or batch-specific reports when required by the applicable standard or contract. | Confirm what was tested, how results are linked to the supplied product, and whether the test method is appropriate. Proof testing is not a substitute for correct design, inspection, and traceability. |
| 8 | Quality management | A current quality-management-system certificate, if claimed, and an explanation of how incoming materials, production, nonconformities, and corrective actions are controlled. | Verify certificate validity and scope with the issuing certification body where possible. ISO 9001 certification concerns a quality management system; by itself, it does not certify a lifting product or its WLL. |
| 9 | Inspection, use, and maintenance guidance | Instructions covering pre-use checks, periodic inspection, storage, maintenance, removal from service, and any product-specific limitations. | Check that guidance is clear and consistent with the product design and applicable rules. The supplier should identify damage or wear conditions that require competent assessment or withdrawal from service. |
| 10 | Technical support and commercial controls | Written answers to technical questions, confirmation of order specifications, lead-time commitments, change-control procedures, and a process for handling complaints or recalls. | Evaluate whether responses are specific and documented. Require approval before changes to materials, design, process, or subcontracted production, and retain the final specification with purchasing records. |