| 1. Payload and moving mass | Confirm the track is sized for the robot and the full moving assembly. Include the robot, end effector, cables, dress pack, and any carried workpiece where applicable. | Rated moving load, load-position assumptions, allowable moments, acceleration limits, and the calculation basis for the proposed configuration. | A documented load review using the actual robot model, mounting orientation, tooling, and planned motion profile. |
| 2. Travel, speed, and motion | Check usable stroke, end-of-travel clearance, required positioning speed, acceleration, duty cycle, and expected stopping distance. | Travel length, rated speed and acceleration under the specified load, motion limits, and any performance conditions or derating. | A layout and cycle-time review that includes approach positions, robot reach, cable routing, and safe stopping zones. |
| 3. Accuracy and repeatability | Distinguish track repeatability from the positioning performance of the complete robot-and-track system. Results depend on mounting, load, speed, temperature, and measurement method. | Defined measurement method, stated test conditions, repeatability data, and any positioning or calibration options. | Application-specific acceptance criteria and a proposed verification method, such as a documented test under representative operating conditions. |
| 4. Mechanical fit and installation | Verify mounting orientation, foundation or frame requirements, rail alignment, floor conditions, access for service, and clearances along the full stroke. | Overall dimensions, mounting drawings, foundation loads, alignment tolerances, installation instructions, and service-clearance requirements. | Reviewed 2D or 3D layout showing the robot, track, work envelope, guarding, cable paths, and maintenance access. |
| 5. Controls and communication | Confirm how the external axis will be commanded and coordinated with the robot controller, including supported motion modes, feedback, and fault handling. | Supported controller configurations, interface documentation, drive and encoder details, required software or licenses, and commissioning responsibilities. | A written control architecture and integration test plan covering coordinated motion, homing, limits, alarms, and recovery after a fault. |
| 6. Safety and compliance | Assess the complete cell, not only the track. Review risk assessment, guarding, access, emergency stops, interlocks, safe limits, and stopping behavior against applicable local requirements. | Safety-related component details, declarations or certificates where applicable, safety functions, instructions, and documentation for the proposed configuration. | A system-level risk assessment and validation plan agreed by the integrator and end user before commissioning. |
| 7. Service, delivery, and lifecycle cost | Compare the complete cost and support package, including installation, commissioning, spare parts, maintenance, downtime planning, and future expansion needs. | Lead-time assumptions, warranty terms, recommended maintenance, spare-parts availability, service coverage, training, and itemized quotation scope. | A documented project schedule, responsibility matrix, maintenance plan, and clear acceptance and after-sales support terms. |