| Design and application fit | 20% | Experience with the relevant turbine type, blade row, operating conditions, geometry, and interface requirements. | Technical proposal, drawing and interface review, design-change process, and examples of comparable applications where disclosure is permitted. | Confirm compatibility with the approved design and operating envelope. Do not treat general turbine experience as proof of fit for a specific blade. |
| Quality management and inspection | 18% | Documented quality controls, inspection planning, nonconformance handling, calibration, and control of subcontracted processes. | Quality-system certificate and scope, inspection and test plan, sample inspection records, calibration records, and corrective-action procedure. | Check certificate validity and scope. Agree acceptance criteria and inspection hold or witness points before production starts. |
| Material traceability | 12% | Control of specified alloy, material condition, heat or batch identity, and traceability from incoming material to finished part. | Material test certificates, heat or batch traceability records, material identification procedure, and records for any approved substitutions. | Specify the required material grade and documentation in the purchase order. EN 10204 inspection-document types may be referenced when appropriate to the contract. |
| Manufacturing capability | 12% | Processes and equipment suitable for the specified blade design, including forming or machining, heat treatment, finishing, and special processes where required. | Process flow, equipment and capacity overview, process qualification records where applicable, and controls for outsourced operations. | Assess capability against the drawing and specification rather than equipment lists alone. Verify any special process requirements for the particular part. |
| Inspection and test capability | 10% | Ability to verify dimensions, surface condition, material properties, and required nondestructive examination against agreed acceptance criteria. | Inspection methods and procedures, sample dimensional reports, test certificates, NDT personnel qualifications where required, and equipment calibration records. | Select inspection methods based on the component and specification. Confirm whether testing is performed in-house or by an approved external laboratory. |
| Delivery and capacity planning | 10% | Quoted lead time, production-slot availability, capacity constraints, schedule controls, and ability to communicate delivery risks. | Project schedule, capacity confirmation, milestone plan, delivery-performance data where available, and escalation procedure. | Compare like-for-like scope and delivery terms. Request a project-specific schedule rather than relying on an unqualified standard lead-time estimate. |
| Technical documentation and configuration control | 6% | Completeness of manufacturing records, revision control, approval of deviations, and retention of product documentation. | Document index, sample manufacturing record pack, revision-control procedure, deviation-request process, and record-retention policy. | Define the required document pack and language, format, and submission milestones in the contract. |
| Commercial value and total landed cost | 6% | Quoted price, tooling or engineering charges, packaging, freight, insurance, duties, payment terms, and potential cost of schedule or quality risks. | Itemized quotation, delivery term, price-validity period, payment schedule, warranty terms, and clearly stated exclusions. | Compare total landed cost and commercial scope, not unit price alone. Ensure quotations use comparable quantities and delivery terms. |
| After-sales and repair support | 4% | Availability of technical assistance, warranty response, failure investigation, replacement-part support, and repair coordination. | Support scope, response and escalation process, warranty conditions, and example root-cause or corrective-action reports where shareable. | Clarify service boundaries, response expectations, and responsibility for investigation costs before award. |
| Compliance and supply-chain risk | 2% | Export-control and sanctions screening as applicable, ethical sourcing, cybersecurity or data-handling requirements, and sub-tier supply-chain visibility. | Compliance declarations, country-of-origin information where required, subcontractor controls, and relevant policies or audit evidence. | Apply the rules relevant to the buyer’s jurisdictions, end use, and contract. Additional requirements may apply to regulated or safety-critical projects. |