| 1 | Machine range and application fit | Published clamping-force range, injection-unit options, tie-bar spacing, platen dimensions, and supported materials. | Machine capacity and configuration must suit the part, mold, resin, and production process. | Confirm that the required mold and process fall within documented machine specifications; avoid comparing machines by clamping force alone. |
| 2 | Process performance and repeatability | Technical data on injection control, position and pressure control, cycle capability, and documented process-validation support. | Stable, repeatable process control can help maintain part quality and reduce variation, but results depend on the application and setup. | Request application-specific trials and compare measured part quality and process variation under equivalent conditions. |
| 3 | Energy efficiency | Energy-consumption data for comparable machine sizes and operating conditions; drive type and available energy-saving features. | Energy use affects operating cost. All-electric and servo-hydraulic designs may differ in consumption, depending on the process and duty cycle. | Compare metered energy per part or per production cycle using the same mold, resin, cycle settings, and production assumptions. |
| 4 | Safety and regulatory documentation | Machine risk assessments, safety-device documentation, conformity records for the destination market, and relevant standards declarations. | Injection molding machinery presents hazards including moving platens, clamping units, and hot material; compliance requirements vary by market. | Verify current, machine-specific documentation. ISO 20430:2020 covers safety requirements for injection molding machines. |
| 5 | Quality management and manufacturing controls | Quality-management certifications, inspection procedures, traceability practices, and documented factory acceptance checks. | Documented quality systems can support consistent manufacturing and issue resolution; certification does not by itself establish machine performance. | Check certificate scope and validity, then review inspection records and acceptance-test procedures for the equipment being purchased. |
| 6 | Service coverage and response capability | Service locations, technician availability, support hours, escalation process, and service arrangements in the buyer’s region. | Access to qualified support can affect recovery time when equipment needs troubleshooting or repair. | Confirm local coverage, expected response terms, language support, and whether service commitments are contractually documented. |
| 7 | Spare-parts availability | Parts catalogs, regional inventory arrangements, lead-time commitments, and identification of critical or long-lead components. | Parts availability can influence maintenance planning and unplanned downtime. | Request lead times and recommended critical-spares lists for the specific machine configuration and operating location. |
| 8 | Controls, connectivity, and integration | Controller documentation, interface options, data-export capabilities, and compatibility information for plant systems and peripherals. | Integration requirements vary across factories, automation cells, and production-monitoring systems. | Validate required interfaces and data fields with the plant’s systems team; confirm functionality in a practical integration test. |
| 9 | Installation, training, and commissioning | Installation scope, commissioning checklist, operator and maintenance training plans, and handover documentation. | Clear commissioning and training arrangements help teams operate and maintain equipment correctly. | Compare the included scope, training hours and audience, required site preparation, and post-installation support terms. |
| 10 | Total cost of ownership and commercial terms | Equipment price, tooling and auxiliary requirements, installation costs, energy assumptions, warranty terms, and maintenance costs. | Purchase price alone does not represent the full cost of owning and operating a machine. | Compare lifecycle costs over the same time horizon and production assumptions; state exclusions, taxes, currency, and service terms clearly. |