| 1 | Specify the complete load | State the maximum payload, trolley weight, lifting attachment weight, and number of trolleys sharing the load. | Example: a 1,000 kg payload plus a 150 kg trolley and attachment creates 1,150 kg of static suspended mass before any applicable dynamic or design allowances. | Rail, hangers, joints, and supporting structure must be checked for the actual load case—not payload alone. |
| 2 | Confirm the load rating basis | Request the rated capacity per trolley and per rail section, plus the assumptions used for load sharing, wheel loading, and duty. | Compare the stated rating with the intended load arrangement. Have qualified engineers verify dynamic effects, impact, eccentric loading, and the supporting structure. | Capacity figures are not directly comparable when suppliers use different configurations or design assumptions. |
| 3 | Describe operating conditions | Identify indoor or outdoor use, ambient temperature, moisture, dust, washdown, corrosive exposure, and nearby heat sources. | Specify the site’s expected temperature range and exposure conditions. Confirm that rail material, finish, wheels, bearings, and lubricant suit those conditions. | Environmental conditions can affect corrosion protection, rolling resistance, lubrication, and component service life. |
| 4 | Map the rail layout | Provide route length, straight sections, curves, junctions, end stops, transfer points, and any elevation changes. | Mark the centerline and dimensions on a plan. For curves, confirm the minimum permitted radius against the selected trolley geometry and load. | Curve compatibility and transitions affect trolley movement, wheel loading, clearance, and the ability to negotiate the route. |
| 5 | Check clearances and obstructions | Measure available headroom and identify columns, pipes, lights, doors, machinery, and pedestrian or vehicle routes. | Show the rail elevation, trolley envelope, suspended-load envelope, and required access or maintenance clearances on the layout drawing. | Clearance checks help prevent collisions and ensure the load can travel and be serviced safely. |
| 6 | Define supports and joints | Record the supporting structure, proposed hanger locations, rail joints, and any structural constraints. | Have support spacing and connection details engineered for the selected rail, load cases, and building structure. Check joint alignment and provision for movement where required by the design. | Rail capacity depends on the complete installed system, including supports and connections—not just the rail section. |
| 7 | Match the system to its duty and maintenance plan | Describe travel frequency, operating hours, manual or powered movement, expected starts and stops, and inspection access. | Request the applicable duty classification or service assumptions, compatible components, inspection guidance, and spare-part requirements. | Usage intensity and maintainability affect wear, availability, and the suitability of the selected trolley and rail system. |